The whole method, in short chapters — how work gets shaped, bet on, and shipped in six-week cycles.
Start with the prefaceWhile the builders spend six weeks on the current bet, the shapers are working up the next pitches. In the two-week cool-down that follows, the betting table decides what gets built next.
Preface · Begin here
The two tracks
Shaping the next work while building the current work. The small vocabulary the rest of the manual is written in — the work, the people, and the picture that holds it together.
4 min · pitch · two tracks · cycle
Bet
Passed
W7
W8
Preface + four chapters
About 33 minutes, cover to cover